The Summit

27th - 29th March 2012

NG Mining Summit Africa

Summit Venue
Arabella Western Cape Hotel & Spa, South Africa

The NG Mining Africa Summit will bring together decision makers from across Africa to meet with solution providers who are actively looking to target this exciting growth market.

  • Previous Summits

White Papers

Designing geomembrane capping layer for long term performance: A case study of closure of tailings storage facility in BHPBilliton Worsley Alumina

An HDPE geomembrane cap was selected for the closure of a 50 Ha Tailings storage facility in Western Australia. A 1000 year design life for the geomembrane was targeted to meet the stringent environmental and longevity requirement of the project. To maximize the resistance to surface oxidation and the initiation of stress cracking, the material was specified with significantly higher stress cracking resistance, oxidative induction times, oven (thermal) aging resistance, and UV resistance, than the GRI.GM13 standard specification. A comprehensive Manufacturing Quality Assurance (MQA) program of plant audits, material sampling, and laboratory testing was implemented. Stress cracking and oven aging results required some special consideration. A careful investigation, detailed analyses and implementation of stringent MQA program resulted in a material that met the requirements of all parties to the project prior to shipping from North America to Australia.

View all